亚洲无码成人电影,手机av在线,羞羞影院午夜男女爽爽视频免费,人妻夜夜爽天天爽三区

Current position:HOME > News > Industry Dynamic

Yuba manufacturers hand to teach you Yuba installation process

Editor:Switch socket _ switch socket to join the agent _ switch socket top ten brands _ Yuba manufacturers wholesale _ Zhejiang GELAN E │ Release Time:2019-01-22 

Yuba is a must-have household appliance for winter bathing. Many people know how to use it, but they don't know how to install it. Today, Yuba manufacturers will teach you the installation process of Yuba.

浴霸安裝流程

1, open the vent


Determine the position of the ventilation holes on the wall, which should be slightly lower than the air outlet of the centrifugal fan casing above the ceiling to prevent the dew condensation water from flowing into the appliance and open a round hole at this position.


2, ceiling preparation


Note that the vacancy is left at the installation position according to the size of the opening, and the height of the sandwich space formed between the ceiling and the top of the house shall not be less than 220 mm.


3, fixed Yuba


Remove the cover, unscrew all the bulbs, disengage the spring from the ring of the mask and remove the cover.


4, wiring


One end of the interactive cord is connected to the switch panel, and the other end is pulled out from the ceiling opening together with the power cord. Open the terminal cover on the cabinet and connect the cable according to the wiring diagram and the terminal mark. Terminal block cover, screw the terminal block cover.


5, connect the ventilation pipe


Pull out the end of the air duct into the room and pull it out on the air outlet of the centrifugal fan casing.


6. Push the box into the hole


According to the position of the air outlet, select the correct direction to insert the Yuba cabinet into the hole. Use 4 wooden screws with a diameter of 4mm and a length of 20mm to fix the box on the ceiling wood.


7, the installation mask


Insert the mask positioning foot and the positioning groove of the box, and insert the spring on the corresponding loop of the mask.


8, install the bulb


Carefully screw all the bulbs into good electrical contact with the lamp holder, then wipe the bulb and mask clean.


9, fixed switch


Secure the switch to the wall to prevent the power cord from being pulled when in use.


The above points are the installation steps of the Yuba, whether it is the lamp warm bath or the air heater, for the Yuba to play the biggest role, then understanding these installation related knowledge is a must.

CONTACT

Fax:0086-573-83250880 Service Hotline:0086-573-83250886 83250887 Free Service Hotline:400-008-7727 E-mail:gelancn@126.com Address:No. 459, Qingyuan Road, Wangdian Town, Jiaxing City, Zhejiang Province
Follow us

Zhejiang GeLan Electric Co., Ltd.

在線咨詢

聯(lián)系電話

400-008-7727

国产欧美不卡可乐| 亚洲插插插| 亚洲综合伊人久久大杳蕉| A级毛片久久精品免费| 免费黄片久久久久久| 日本性极品| 中文字幕久热精品视频在线| 日韩国产毛片| 欧美精品一区二区熟女| 婷婷午夜丁香| 新干县| 无码精品A∨在线观看中文| 碰超碰| 香蕉91午夜| 久久人人艹成人网站| 无码任你躁久久久久久老妇 | 色综合av| 国语精品| 狠狠涩狠狠鲁| 日本激情小说网| 中文字幕AV在线操| 人妻少妇精品视频专区 | 精品久久*5| 亚洲五月丁香婷婷| 四虎无码| 亚洲v无码一区二区三区四区观看| 白嫩国产精品| 毛片三级在线观看| 裸体美女免费AV| 97福利| 色窝窝在线视频| 久久人妻免费公开上传| 开心色四网久久| 国产蜜臀在线观看| 久久亚洲精品无码VA大香大香| 草草草在线观看| S亚洲之殴美黄片| 欧美日韩丁香| 美女潮喷视频| 色欲aⅴ亚洲情无码AV蜜桃| 久久久毛片视频|